Attributes . 48" Long Leads (Straight to Retractile Stacking Plug, Red, Black), Large Insulated Alligator Clips (Red, Black 1000V), Standard Alligator Clips with Rubber Boots (Red, Black, 3A) Spade Lug Adapter, 6mm (Red, Black, 3A), Insulated Shrouded 4mm Banana Plug Adapters, (Red, Black 42V, 10A), Remote Sensing Leads (Red, Black) . Names